Monday Morning Recovery Ride
Monday, January 09, 2023
Isherwood Staging Area, 2200 Isherwood Way, Paseo Padre Pkwy, Fremont, CA 94536, USA (map) DescriptionLength: 37.9 miles; Elevation: ~800 feet w/o and 1065 feet w/ Nike Hill climb Terrain: 1,2 Pace: M (faster and slower riders welcome; ride leader will stay with M pace riders.) 0 Vaccinated riders only with all boosters as allowed by CDC. 0 Meet at 8:30 am for an 8:45 am start from the sidewalk across the street from the Isherwood Staging Area's parking lot entrance to the Alameda Creek Trail (on the north side of Isherwood Way next to Quarry Lakes Park near Paseo Padre Pkwy). 0 Enjoy an easy-going ride down Paseo Padre with a regroup at the Lake Elizabeth restrooms across from Bayliss St. Continue down Paseo Padre to the next regroup at Grimmer. Then it's a flat ride to south Fremont and Panera. Then we will make our way to Coyote Hills Regional Park with a final regroup at the picnic tables on the Coyote Creek Trail. 0 Route: https://ridewithgps.com/routes/41585140. Please print and bring your own cue sheet. 0 Rain, significant chance of rain or poor riding condition cancels. A ride cancellation email will be posted to "https://ffbc.groups.io/g/info/topics" on the morning of the ride if it is being cancelled (no email means the ride is on). If you are unsure of the ride status, call or text ride leader on the morning of the ride. Note ride end time is a rough estimate. 0 Julie Gilson Jlgilson99@gmail.com (510) 468-0284 2023, 8:30am – 12:30pm
E-mail:
Club: Fremont Freewheelers click for this clubs
Type: Road Where: East Bay