Home | Mobile | E-Mail Us | Privacy | Mtn Bike | Ride Director Login | Add Century/Benefit Rides
Home

Janus Sequential Centuries - Day Two

Sunday, January 22, 2023

See above for background on these centuries. Today is the clockwise route. It=s the reverse of yesterday so it Peeking through the fence at Knottā€™s Berry Farm starts with the downhill on Potrero. Then it=s on to Ventura and up to Ojai, over Dennison Grade to Santa Paula and over Grimes Canyon to Moorpark and back. Although more of the climbing is in the 2nd half of the ride today, it tends to be less steep than day one and I feel it is a little easier. In the years I rode both days, I usually had a faster time on the 2nd day despite being tired from riding day one. The metric route stays with the full century for the first 32 miles and cuts straight over to the Moorpark area to rejoin the full century on the final few miles of the return. This metric century cuts out much of the climbing of the full century. START: The start location today is the same as day one B see above. (Full Century 101 mi and 5100 ft, Metric Century 65 mi and 2600 ft)

E-mail:

Club: Los Angeles Wheelmen click for this clubs Click for Rating

Type: Road  Where: Southern CA

Ride 10 of 12

 



Rides
View All

Century's
View All

Links
Commercial
Bike Sites
Teams

Other
Advertise
Archive
Privacy
Bike Reviews

Bill
All Columns
About Bill

Bloom
All Columns
Blog

About Naomi

© BikeCal.com 2023