Home | Mobile | E-Mail Us | Privacy | Mtn Bike | Ride Director Login | Add Century/Benefit Rides
Home

 Monday Morning Recovery Ride

Monday, January 23, 2023

Isherwood Staging Area, 2200 Isherwood Way, Paseo Padre Pkwy, Fremont, CA 94536, USA (map) DescriptionLength: 38.4 miles; Elevation: 712 feet; Terrain: 1,2 Pace: M 0 Meet at 8:30 am for an 8:45 am start across the street from the Isherwood Staging Area's parking lot entrance to the Alameda Creek Trail (on the north side of Isherwood Way next to Quarry Lakes Park near Paseo Padre Pkwy).  0 Enjoy an easy-going ride down Paseo Padre with a regroup at the Lake Elizabeth restrooms across from Bayliss St. Continue down Paseo Padre to the next regroup at Grimmer. Then it's a flat ride to south Fremont and to our chosen coffee stop, Starbucks McCarthy Ranch.  Then we will make our way to back.  0 Route:   https://ridewithgps.com/routes/37548012 0 Rain, significant chance of rain or poor riding condition cancels. A ride cancellation email will be posted to "https://ffbc.groups.io/g/info/topics" by the ride leader (if there is one) on the morning of the ride if it is being cancelled (no email means the ride is on). If you are unsure of the ride status, call or text ride leader on the morning of the ride. Note ride end time is a rough estimate. 0 Robert Tashjian: rob@tashjian.com, (510) 593-6228 2023, 8:30am – 12:30pm

E-mail:

Club: Fremont Freewheelers click for this clubs Click for Rating

Type: Road  Where: East Bay

Ride 1 of 8

 



Rides
View All

Century's
View All

Links
Commercial
Bike Sites
Teams

Other
Advertise
Archive
Privacy
Bike Reviews

Bill
All Columns
About Bill

Bloom
All Columns
Blog

About Naomi

© BikeCal.com 2023